Shenzhen Honreal Technology Co.,Ltd

We take "honor, honest, honey, real" as our corporate culture. The quality of the company's products is reliable, the company is honest and trustworthy, establishes a close cooperative relationship

Manufacturer from China
Verified Supplier
2 Years
Home / Products / SMT Cleaning Machine /

Co2 Dry Ice Blasting Cleaning Machine PCBA Board Cleaning Machine

Contact Now
Shenzhen Honreal Technology Co.,Ltd
Visit Website
Country/Region:china
Contact Person:MissMonica Wang
Contact Now

Co2 Dry Ice Blasting Cleaning Machine PCBA Board Cleaning Machine

Ask Latest Price
Video Channel
Brand Name :Honeal
Model Number :HR-04
Certification :CE
Place of Origin :China
MOQ :1 set
Price :Negotiable
Payment Terms :T/T,, Western Union, MoneyGram
Supply Ability :100 Sets Per Month
Delivery Time :15 work days
Packaging Details :Export wooden box packaging
Machine name :Dry Ice PCBA Cleaning Machine
Dimension :560*360*500(mm)
Voltage :AC110/220V 50/60HZ
Rated power :0.25KW
Dry ice cube size processed :140*125*250mm (around 5KG)
Dry Ice Flow :0~1.0KG/min
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Co2 Dry Ice Blasting Cleaning Machine PCBA Board Cleaning Machine

Principle of Dry Ice Blasting

The principle of dry ice deburring/cleaning is that dry ice particles are driven by compressed air and impact the surface to be deburred at high speed. Dry ice is crushed and sublimated in an instant. Absorbs a lot of heat. Due to the difference in thermal expansion coefficient between the burr and the substrate, the burr cracks rapidly. The crushed dry ice particles enter the cracks, and due to the vaporization of the dry ice, its volume expands nearly 800 times in an instant. This creates a "micro-bomb" at the point of impact and the burrs are quickly stripped off for optimum cleaning results.

Dirt, burrs, etc. quickly crack and break away to achieve the effect of removal.

Technical Parameter

Model HR-04
Applicable Voltage AC110/220V 50/60HZ
Dimension/Weight 560*360*500(mm)/50KG
Main Motor Power 0.25KW
Dry Ice Flow/Working Air Pressure 0~1.0KG/min /0.2~0.6Mpa(adjustable parameter)
Applicable Dry Ice 140*125*250mm (around 5KG)
Hopper Capacity 5KG
Ice Pipe GTL 1/2 Special for low temperature dry ice
Protection Degree IP55
Electronic Components Imported

Dry ice cleaning advantages
1.Dry ice particles can be sprayed into microorganisms that are difficult to clean with traditional methods.
Small spaces, for very precise molds or product surfaces,It won't cause any damage at all.
2.High-density dry ice particles impact the surface more strongly,Release more kinetic energy to remove

stubborn stains quickly and efficiently effect.
3.The unique physical properties of dry ice make it the perfect cleaning medium. Dry ice is non-corrosive,

will not damage surfaces. Dry ice is sprayed at high speed.
4.It sublimates quickly after the surface of the object, and will not cause secondary pollution. No chemical

solvents are used in the entire cleaning process, making the working environment more environmentally

friendly and safer for workers.
5.Save time – no drying required, after cleaning the circuit boards are dry and ready for packaging.
6.Environmentally friendly – no toxic wastewater is produced. The removed residue is separated and discarded in the air filter.
7.Selective – no need to clean the entire PCB, only the side containing flux residue High sensitivity – removes flux residue without affecting the PCB structure

These advantages make dry ice (snow) cleaning an efficient, economical and environmentally friendly cleaning solution.

Machine structure diagram

Co2 Dry Ice Blasting Cleaning Machine PCBA Board Cleaning Machine


Cleaning effect comparison

Co2 Dry Ice Blasting Cleaning Machine PCBA Board Cleaning Machine

Co2 Dry Ice Blasting Cleaning Machine PCBA Board Cleaning Machine

Environment

Do not use in flammable and explosive gas environment, corrosive environment, water-prone environment and near flammable objects. Otherwise, there is a possibility of fire, electric shock, or injury.

Installation, wiring, running, operation, inspection, fault analysis and other operations must be carried out by professional and technical personnel, otherwise there may be fire, electric shock and injury.

Do not carry out operations such as moving, installing, wiring, and checking when the power is on (must be carried out after cutting off the power), otherwise there is a possibility of electric shock.

Installation

Please install the product reliably on a flat site and leave enough room for operation.

After installation, the device casing must be grounded, otherwise there is a possibility of electric shock.

Wiring

Please observe the rated range of the input voltage of the power supply, otherwise there is a possibility of electric shock and injury.

Do not forcibly bend, pull, or pinch the connection cables, otherwise there may be fire or electric shock.

Do not disassemble, change, or replace electrical and air circuit components without authorization, otherwise there may be product damage, human electric shock, and injury.

Running

Do not disassemble or replace electrical and air circuit components or parts while the device is working, otherwise there may be injury and damage to the device.

Maintenance and Inspection

Do not touch the wiring terminals of the circuit just after the power is cut off (within 5 minutes), otherwise there is a possibility of electric shock due to residual voltage.

Inquiry Cart 0